by Potato Please Guide
Published: November 15, 2026 (34 minutes ago)
The sack has tipped, the drum is running, and the hopper still looks full. How many potatoes did the machine actually process? Potato Please Guide has a drum calculator you can use alongside your shift. Record the starting inventory, count the potatoes that land inside the hopper, then record the ending inventory and elapsed time. If you start with 40, add 30 and finish with 20 after three minutes, the drum processed 50 potatoes, or about 16.7 per minute. If potatoes spill and you lose count, pause deliveries for the next reading. The guide also shows how to time a drain test and compare the result with the walk back to the outdoor pile. A new sack arriving mid-test is your cue to start a fresh measurement.